menu

PHI Rockville & Benning Service Center

  • Benning - Mens Room - Before Shot 2
  • Benning - Office Area - Before Shot
  • Rockvville 1st Floor before Photos  2
  • Rockville 1st Floor Before Photos 1
  • Rockville 1st Floor Before Photos 5
  • 2D0V0490 copy
  • 2D0V0481 copy
  • 2D0V0470 copy
  • 2D0V0446 copy
  • 2D0V0431 copy
  • 2D0V0524 copy

Two Before & After studies: A utilitarian pair of renovation projects for two service centers in Maryland, these buildings are home base to some of Pepco’s crews of linemen. The project included most of the first floors of both buildings, including the bathroom and lockers rooms for the lin     emen. Due to the extent of the work and age of the existing space prior to renovation, the spaces needed to be aligned with current codes and ADA accessibility standards. Our design team was led by Nick d’Argenio, who signed and sealed the construction documents as the design professional responsible for the work and its conformance with those codes.

Knowing the muddy-boot nature of this workspace, the design team chose solutions that would clean easily, and finishes in colors and patterns that, while paying attention to branding, conceal dirt. The result is a simple space that looks great, more functionally arranged, and is a pleasant workspace.

Rockville 1st Floor Before Photos 1Rockvville 1st Floor before Photos  2Rockville 1st Floor Before Photos 5
Benning - Mens Room - Before Shot 2Benning - Office Area - Before Shot2D0V0481 copy
2D0V0490 copy2D0V0470 copy
2D0V0431 copy2D0V0524 copy
2D0V0446 copy